The Resource Study of benefits of improved powerplant reliability and productivity, prepared for U.S. Department of Energy, Economic Regulatory Administration, Division of Power Supply and Reliability

Study of benefits of improved powerplant reliability and productivity, prepared for U.S. Department of Energy, Economic Regulatory Administration, Division of Power Supply and Reliability

Label
Study of benefits of improved powerplant reliability and productivity
Title
Study of benefits of improved powerplant reliability and productivity
Statement of responsibility
prepared for U.S. Department of Energy, Economic Regulatory Administration, Division of Power Supply and Reliability
Contributor
Subject
Language
eng
Cataloging source
GPO
Government publication
federal national government publication
Illustrations
illustrations
Index
no index present
Literary form
non fiction
Nature of contents
bibliography
http://library.link/vocab/relatedWorkOrContributorName
United States
Series statement
  • HCP/B60792-01
  • HCP/B60792-02
http://library.link/vocab/subjectName
  • Electric power production
  • Electric power-plants
Label
Study of benefits of improved powerplant reliability and productivity, prepared for U.S. Department of Energy, Economic Regulatory Administration, Division of Power Supply and Reliability
Instantiates
Publication
Note
  • Prepared under contract no. CR-05-60792-00
  • Issued Feb. 1978
Bibliography note
Includes bibliographical references
Carrier category
volume
Carrier category code
nc
Carrier MARC source
rdacarrier
Content category
text
Content type code
txt
Content type MARC source
rdacontent
Contents
Phase 1 report, Factors considered in planning generation.--Phase 2 report, Analysis of two utility systems and regions
Control code
16973429
Dimensions
28 cm.
Extent
2 volumes
Media category
unmediated
Media MARC source
rdamedia
Media type code
n
Other physical details
illustrations
Label
Study of benefits of improved powerplant reliability and productivity, prepared for U.S. Department of Energy, Economic Regulatory Administration, Division of Power Supply and Reliability
Publication
Note
  • Prepared under contract no. CR-05-60792-00
  • Issued Feb. 1978
Bibliography note
Includes bibliographical references
Carrier category
volume
Carrier category code
nc
Carrier MARC source
rdacarrier
Content category
text
Content type code
txt
Content type MARC source
rdacontent
Contents
Phase 1 report, Factors considered in planning generation.--Phase 2 report, Analysis of two utility systems and regions
Control code
16973429
Dimensions
28 cm.
Extent
2 volumes
Media category
unmediated
Media MARC source
rdamedia
Media type code
n
Other physical details
illustrations

Library Locations

    • Indiana State LibraryBorrow it
      315 W. Ohio St., Indianapolis, IN, 46202, US
      39.77004 -86.164015

Library Links

Processing Feedback ...