Coverart for item
The Resource Status and cost overruns of the International Space Station : hearing before the Subcommittee on Space and Aeronautics of the Committee on Science, U.S. House of Representatives, One Hundred Fifth Congress, first session, November 5, 1997

Status and cost overruns of the International Space Station : hearing before the Subcommittee on Space and Aeronautics of the Committee on Science, U.S. House of Representatives, One Hundred Fifth Congress, first session, November 5, 1997

Label
Status and cost overruns of the International Space Station : hearing before the Subcommittee on Space and Aeronautics of the Committee on Science, U.S. House of Representatives, One Hundred Fifth Congress, first session, November 5, 1997
Title
Status and cost overruns of the International Space Station
Title remainder
hearing before the Subcommittee on Space and Aeronautics of the Committee on Science, U.S. House of Representatives, One Hundred Fifth Congress, first session, November 5, 1997
Creator
Subject
Language
eng
Government publication
federal national government publication
Illustrations
illustrations
Index
no index present
Literary form
non fiction
Nature of contents
bibliography
http://bibfra.me/vocab/lite/organizationName
United States
http://library.link/vocab/subjectName
  • International Space Station
  • Space stations
  • United States
Label
Status and cost overruns of the International Space Station : hearing before the Subcommittee on Space and Aeronautics of the Committee on Science, U.S. House of Representatives, One Hundred Fifth Congress, first session, November 5, 1997
Instantiates
Publication
Note
  • Distributed to some depository libraries in microfiche
  • Shipping list no.: 98-0144-P
  • "No. 28."
Bibliography note
Includes bibliographical references
Carrier category
volume
Carrier category code
nc
Carrier MARC source
rdacarrier
Content category
text
Content type code
txt
Content type MARC source
rdacontent
Control code
17425846
Dimensions
24 cm
Extent
iii, 51 pages
Isbn
9780160560439
Media category
unmediated
Media MARC source
rdamedia
Media type code
n
Other physical details
illustrations
Label
Status and cost overruns of the International Space Station : hearing before the Subcommittee on Space and Aeronautics of the Committee on Science, U.S. House of Representatives, One Hundred Fifth Congress, first session, November 5, 1997
Publication
Note
  • Distributed to some depository libraries in microfiche
  • Shipping list no.: 98-0144-P
  • "No. 28."
Bibliography note
Includes bibliographical references
Carrier category
volume
Carrier category code
nc
Carrier MARC source
rdacarrier
Content category
text
Content type code
txt
Content type MARC source
rdacontent
Control code
17425846
Dimensions
24 cm
Extent
iii, 51 pages
Isbn
9780160560439
Media category
unmediated
Media MARC source
rdamedia
Media type code
n
Other physical details
illustrations

Library Locations

    • Indiana State LibraryBorrow it
      315 W. Ohio St., Indianapolis, IN, 46202, US
      39.77004 -86.164015

Library Links

Processing Feedback ...