The Resource Integrated motorist information system (IMIS) feasibility and design study : phase II, generalized methodology for IMIS feasibility studies / P. Zove, C. Berger

Integrated motorist information system (IMIS) feasibility and design study : phase II, generalized methodology for IMIS feasibility studies / P. Zove, C. Berger

Label
Integrated motorist information system (IMIS) feasibility and design study : phase II, generalized methodology for IMIS feasibility studies / P. Zove, C. Berger
Title
Integrated motorist information system (IMIS) feasibility and design study
Title remainder
phase II, generalized methodology for IMIS feasibility studies / P. Zove, C. Berger
Creator
Contributor
Subject
Language
eng
Cataloging source
GPO
http://library.link/vocab/creatorName
Zove, P
Government publication
federal national government publication
Illustrations
illustrations
Index
no index present
Literary form
non fiction
http://library.link/vocab/relatedWorkOrContributorName
  • Berger, C
  • United States
http://library.link/vocab/subjectName
  • Traffic engineering
  • Traffic signs and signals
  • Express highways
Label
Integrated motorist information system (IMIS) feasibility and design study : phase II, generalized methodology for IMIS feasibility studies / P. Zove, C. Berger
Instantiates
Publication
Note
  • "Report no. FHWA-RD-78-23"--v.1
  • "Report no. FHWA-RD-78-24"--v.2
  • Prepared by the Sperry Systems Management, Sperry Rand Corporation, under contract DOR-FH-11-8871
  • Final report issued May 1978
Carrier category
volume
Carrier category code
nc
Carrier MARC source
rdacarrier
Content category
text
Content type code
txt
Content type MARC source
rdacontent
Contents
v.1. IMIS feasibility study handbook.--v. 2. Validation and application of feasibility study handbook
Control code
16979548
Dimensions
28 cm
Extent
2 volumes
Media category
unmediated
Media MARC source
rdamedia
Media type code
n
Other physical details
illustrations
Label
Integrated motorist information system (IMIS) feasibility and design study : phase II, generalized methodology for IMIS feasibility studies / P. Zove, C. Berger
Publication
Note
  • "Report no. FHWA-RD-78-23"--v.1
  • "Report no. FHWA-RD-78-24"--v.2
  • Prepared by the Sperry Systems Management, Sperry Rand Corporation, under contract DOR-FH-11-8871
  • Final report issued May 1978
Carrier category
volume
Carrier category code
nc
Carrier MARC source
rdacarrier
Content category
text
Content type code
txt
Content type MARC source
rdacontent
Contents
v.1. IMIS feasibility study handbook.--v. 2. Validation and application of feasibility study handbook
Control code
16979548
Dimensions
28 cm
Extent
2 volumes
Media category
unmediated
Media MARC source
rdamedia
Media type code
n
Other physical details
illustrations

Library Locations

    • Indiana State LibraryBorrow it
      315 W. Ohio St., Indianapolis, IN, 46202, US
      39.77004 -86.164015

Library Links

Processing Feedback ...