The Resource Feasibility study of an earth melting penetrator system for geoprospecting tunnel right-of-ways, by D.L. Black ; prepared for Office, Chief of Engineers, U.S. Army under contract no. DACW 39-76-C-0163 ; monitored by Geotechnical Laboratory, U.S. Army Engineer Waterways Experiment Station

Feasibility study of an earth melting penetrator system for geoprospecting tunnel right-of-ways, by D.L. Black ; prepared for Office, Chief of Engineers, U.S. Army under contract no. DACW 39-76-C-0163 ; monitored by Geotechnical Laboratory, U.S. Army Engineer Waterways Experiment Station

Label
Feasibility study of an earth melting penetrator system for geoprospecting tunnel right-of-ways
Title
Feasibility study of an earth melting penetrator system for geoprospecting tunnel right-of-ways
Statement of responsibility
by D.L. Black ; prepared for Office, Chief of Engineers, U.S. Army under contract no. DACW 39-76-C-0163 ; monitored by Geotechnical Laboratory, U.S. Army Engineer Waterways Experiment Station
Creator
Contributor
Subject
Language
eng
Member of
Cataloging source
AEF
http://library.link/vocab/creatorName
Black, D. L
Government publication
federal national government publication
Illustrations
illustrations
Index
no index present
Literary form
non fiction
Nature of contents
bibliography
http://library.link/vocab/relatedWorkOrContributorName
  • United States
  • Geotechnical Laboratory (U.S.)
  • Westinghouse Electric Corporation
Series statement
Technical report
Series volume
S-78-17
http://library.link/vocab/subjectName
  • Boring
  • Prospecting
  • Soil penetration test
  • Tunneling
Label
Feasibility study of an earth melting penetrator system for geoprospecting tunnel right-of-ways, by D.L. Black ; prepared for Office, Chief of Engineers, U.S. Army under contract no. DACW 39-76-C-0163 ; monitored by Geotechnical Laboratory, U.S. Army Engineer Waterways Experiment Station
Instantiates
Publication
Note
  • Cover title
  • "Final report."
  • "Westinghouse Advanced Energy Systems Division."
  • "December 1978."
Bibliography note
Includes bibliographical references
Carrier category
volume
Carrier category code
nc
Carrier MARC source
rdacarrier
Content category
text
Content type code
txt
Content type MARC source
rdacontent
Control code
16986671
Dimensions
27 cm.
Extent
155 pages
Media category
unmediated
Media MARC source
rdamedia
Media type code
n
Other physical details
illustrations
Label
Feasibility study of an earth melting penetrator system for geoprospecting tunnel right-of-ways, by D.L. Black ; prepared for Office, Chief of Engineers, U.S. Army under contract no. DACW 39-76-C-0163 ; monitored by Geotechnical Laboratory, U.S. Army Engineer Waterways Experiment Station
Publication
Note
  • Cover title
  • "Final report."
  • "Westinghouse Advanced Energy Systems Division."
  • "December 1978."
Bibliography note
Includes bibliographical references
Carrier category
volume
Carrier category code
nc
Carrier MARC source
rdacarrier
Content category
text
Content type code
txt
Content type MARC source
rdacontent
Control code
16986671
Dimensions
27 cm.
Extent
155 pages
Media category
unmediated
Media MARC source
rdamedia
Media type code
n
Other physical details
illustrations

Library Locations

    • Indiana State LibraryBorrow it
      315 W. Ohio St., Indianapolis, IN, 46202, US
      39.77004 -86.164015

Library Links

Processing Feedback ...